ProVisions, LLC

The Arboretum

Executive Summary

ProVisions Investors, LLC (“PVI”) presents an outstanding opportunity at The Arboretum. The Arboretum announces its 3rd Phase of expansion. Interested parties including but not limited to, Investors, family offices, financial institutions, and/or development firms are encouraged to submit written expressions of interest.

This premier 31-acre site is located near Lambeau Field, Resch Center, Titletown District, and Bay Park Square.

The site is currently zoned B-3 Business District, permitting multifamily, office, hotel, retail, research & development, or mixed-use combinations, with permitted building heights up to 120 feet. This zoning flexibility, combined with strong market growth in the immediate area, positions the property as a rare opportunity.

The Arboretum has an existing ±218,323 square foot mixed-used building with credit tenants and 72,774 square foot floors valued at over $62.1M and insured at $46.2M.

PVI seeks written expression of interest, letter of intent, and offers for:

  • Acquisition of Land, Buildings, and Infrastructure
  • Joint Venture Partners
  • Land Lessees for its Pad Sites or Site Condominiums
  • Tenants
  • Capital Providers
  • Build-to-Suit Users

Premier Development Site

Significant Vertical Development Capacity

  • Permitted building height up to 120 feet without a variance, allowing for high-rise residential, office, retail, hotel, medical or mixed-use development.

Unmatched View Opportunities

  • Potential for the best panoramic views of Lambeau Field, Titletown, the Resch Center, and the Fox River.

Unique Waterfront Integration

  • Dutchman Creek, within the Property, offers natural features that can be activated for development, including:
  • Walking and biking trails
  • Observation decks
  • Outdoor playscapes and family activity areas
  • Creek-side dining, patios, or entertainment zones
  • Pocket parks and programmed public spaces

Development Plan – Programing Phasing Investment 7.2026 Click to view now!

Project Highlights

  • Property: The Arboretum, 700 Pilgrim Way
  • Building Size: ±218,323 SF suburban, mixed-use building (two stories above grade plus one full lower level; ±72,774 SF floor plates). Existing building is allowed to be expanded up to 120 feet in height (12-stories above grade) (±873,288 SF) without a variance.
  • Land Size: 31 acres
  • Zoning: B-3 Business District (120-foot building height permitted without variance) permitting multifamily, office, hotel, retail, R&D, or mixed-use combinations throughout The Arboretum
  • Market Valuation: $62.1M Property and Land
  • Insured Value: Property and Land at $46.2M
  • Development and Property Value at Completion: $352M – $680M depending on height density, etc.
  • Proximity: Near the world famous Lambeau Field, Titletown, and Resch Center with $3.2 Billion in new development announced
  • Visibility: Across from Bay Park Square (a Class-A Simon Retail Regional Mall)
  • Market Growth: Exceptional within the Stadium and Entertainment District

Gallery

Property Specifications

Mixed-Use

700 W Pilgrim Way, Village of Ashwaubenon, Wisconsin 

31.44 Acres

Flat/Minimal Grade

B-3 Business District

100% Wet System

Serviced by WPS, One (1) pad-mounted transformer. Transformed 480.277 volt, 3-phase, 4-wire service. 3,000 amp unit, three (3) diesel generators

One (1) primary facility

218,323 square feet with 119,551 available for lease

Two (2) stories above grade with One (1) story below grade

Constructed in 1987

2023, 2024 and scheduled for 2025

Brick and stone exterior walls with reinforced concrete, concrete block and structural steel supports

Total of 901 parking spaces with 15 designated as ADA accessible spaces

Two (2) steel sectional overhead drive in/dock high doors

Lower Level slab to slab height of 15 feet 

First and Second Level slab to slab height of 14 feet

Floor Plan

Survey & Site Map

Location

Want To Learn More?